Kozhikode-Wayanad tunnel project in Keralam remains stalled despite submission of documents
Read the full story at The Hindu

Kozhikode Construction of the Anakkampoyil-Kalladi-Meppadi twin-tube tunnel project in Keralam remains suspended at both portals, with no indication of an early resumption even after Konkan Railway Corporation Limited (KRCL), the implementing agency, and its EPC (Engineering, Procurement and Construction) contractor, Dilip Buildcon Ltd., submitted all the documents sought by the State government-appointed expert committee probing the landslide at the north portal.
The prolonged stoppage has raised concerns over the safety and durability of the 110-metre stretch of tunnelling already completed in the right tube on the Anakkampoyil side.
KRCL and the contracting agency have reportedly warned that continued suspension could lead to deterioration of the completed work.
More world
- International cricketers fall in love with Nepal beyond TU GroundKathmandu Post
- The Nepali border villages that empty for six months every yearKathmandu Post
- Modi in Bengaluru: PM flags off elevated stretch of Namma Metro Pink Line | LIVEThe Hindu
- Shashi Tharoor alleges 115 Bharat Summit speakers were denied entry into India, or their visas were cancelledThe Hindu
- China's Defence Ministry says it maintains dialogue with the U.S.The Hindu
- SpiceJet Board to consider fundraising proposal on Nov. 18 amid operational headwindsThe Hindu