Road reopens in both directions after landslide cleared at Ghoptebhir
Read the full story at Onlinekhabar English

Chitwan, November 8 Traffic along the Prithvi Highway has resumed in both directions after a dry landslide at Ghoptebhir in Ichchhakamana Rural Municipality-4 was cleared. The landslide, which occurred on Sunday morning, had blocked the highway. Two-way traffic resumed at 2:15 pm. Earlier, the road had partially reopened to one-way traffic from noon.
According to […] Chitwan, November 8 Traffic along the Prithvi Highway has resumed in both directions after a dry landslide at Ghoptebhir in Ichchhakamana Rural Municipality-4 was cleared. The landslide, which occurred on Sunday morning, had blocked the highway. Two-way traffic resumed at 2:15 pm. Earlier, the road had partially reopened to one-way traffic from noon.
According to […] Chitwan, November 8 Traffic along the Prithvi Highway has resumed in both directions after a dry landslide at Ghoptebhir in Ichchhakamana Rural Municipality-4 was cleared. The landslide, which occurred on Sunday morning, had blocked the highway. Two-way traffic resumed at 2:15 pm. Earlier, the road had partially reopened to one-way traffic from noon.
More environment
- सुक्खा पहिरो खसेपछि पृथ्वी राजमार्ग अवरुद्धNepal Khabar
- How China’s clean-tech machine is reshaping the global climate fightKathmandu Post
- Jijivisha stitched Everest onto a red-carpet suit. Nothing came from Paris, Milan or New York.Kathmandu Post
- रुकुम पश्चिमको बाँफिकोटमा वर्षा जारी, अन्यत्र पनि सम्भावनाOnlinekhabar (Nepali)
- भोटेकोशी बाढीले ऊर्जा क्षेत्रमा १ खर्ब ३२ अर्ब बराबर क्षतिOnlinekhabar (Nepali)
- Cop31: what is at stake at the UN climate summit and what can it achieve?The Guardian